Shetland Islands · Scotland

New-build mastic & snagging in Melby, Shetland Islands

We cover Melby for plot mastic for developers and snagging failed sealant in new homes. Old material cut out, joints cleaned and sealed neatly and every job guaranteed for a year.

  • Shower seals failing in the first year or two
  • Sealant that never bonded to the surface
  • Gaps opening as the house dries out and settles

Trusted new build mastic in Melby

New build mastic in Melby

If your new home has a leaking shower seal, open skirting joints or untidy sealant, we can help. While the builder’s snagging or warranty period runs, report it to them first and if that stalls, we can do it. We are often asked to deal with kitchen sealant that has pulled off the wall and beads laid onto grit and dust from the build, across skirting & floors, plot handovers and show homes.

Many newer homes in Scotland are timber-framed and settle as they dry out, so skirting and floor joints can open up. Older stone-built homes, meanwhile, often have timber floors that move with the seasons.

You get a one-year guarantee, the same in Melby as everywhere else we work.

Location
Melby (ZE2)
Wider area
Shetland Islands
Cover
One year on every job
Quotes
A clear quote up front
Email
info@mrmastic.co.uk
Page updated
26 October 2026
Applicator in a navy top running a bead of silicone up a shower screen wall profile

Keeping the joints in good condition

Good habits help new joints last longer. Our tips:

  • Watch for new gaps as the house dries out
  • Put sealant faults on your snagging list early
  • Wait for the cure time before using a resealed shower
  • Clean sealant with mild detergent, not abrasives

Leave the sealant for the cure time we give you before showering or bathing. Most silicones need around a day before water reaches them.

A seal that splits early is often a sign of movement. Getting it resealed properly, and any movement checked, stops it recurring.

How it works

Before we leave, we go over the finished joints with you and explain the cure time. The work normally takes anything from a few hours to several days, depending on the number of plots, depending on the size of the job. Around Melby, distance and access matter more than parking. Let us know how to find you and how to reach the joints.

  1. We start by going through the snagging items or plot schedule with you.
  2. The failed sealant is removed completely, with no layer left behind.
  3. Joints are vacuumed and cleaned of building dust.
  4. Primer goes on where the surface and product need it, then the new sealant.
  5. We tool every joint neatly and tell you when each area can be used.

Before we arrive

  • Tell us if parking is tricky
  • Keep pets and children clear of the area while we work
  • Clear the area around the work

How to get a quote

For a quote, drop us a line at info@mrmastic.co.uk and tell us where the job is and what the problem looks like. You will have a clear quote before any work starts.

Get a quick quote

Advice

Leave it or put it right?

It often makes sense to do all the sealant items on a snagging list together. It’s one visit, one quote and one set of cure times. Around Melby, water from a failed joint in an older stone home can soak into timber and plaster.

Instead of a standard rate, we price the job in front of us: the amount of work, the old material and the access. You will know the price before we begin.

Why choose Mr Mastic in Melby

  • Colour picked to suit the job
  • We’re fully insured
  • Colour agreed with you before work begins
  • A choice of colours where the product allows

Read what affects the cost and customer reviews.

Questions from Melby

Is Melby in your area for new build mastic?

Yes. Our work covers the whole of Scotland, and Melby is part of that. Just drop us a line at info@mrmastic.co.uk with a few details of the job.

Is new build mastic in Melby guaranteed?

All our work, in Melby and everywhere else, comes with a 12-month guarantee. We are fully insured, and an ARBOMaster approved applicator.

I rent my home. Can I book you?

We can work for tenants, landlords or agents. Get your landlord’s agreement first.

How long does new build mastic take?

Most jobs take a few hours in a single home, including the preparation. We’ll confirm how long when we quote.

Is there any odour?

Possibly a little. It fades as the sealant cures.

When is the sealant fully cured?

That depends on the sealant used, so please follow the time we give you.

Do I need to be at home?

Access is agreed with you when the job is booked. For inside work, that normally means someone being in.

Will it make a mess?

No. We protect the surfaces around the joints, and we tidy up before we go.

DIY versus a professional finish

Some jobs are best left to a professional: high-level joints, fire-rated gaps, external movement joints and big jobs need the right product, the right access and the right method.

Sealing over old silicone is the commonest DIY error. Silicone does not stick to old silicone, so it lifts and traps water and mould underneath. Everything old must be removed first.

When it isn’t the sealant

In fairness, some problems need a different trade:

  • Settlement cracks that need a surveyor
  • Broken tiles or a split tray
  • Deciding who is responsible under a builder’s warranty

Not sure which it is? You can email us at info@mrmastic.co.uk and we’ll tell you honestly.

Where we work in Melby

  • Skirting & floors
  • Windows & doors
  • Plot handovers
  • Bathrooms & en suites
  • Kitchens
  • Show homes

What the job involves on each surface

Plot handovers

Developers can send the plot schedule and specification. Sealant work across the plot is covered as agreed.

Bathrooms and en suites

Trays and baths in new builds settle as they’re used. We reseal once the old bead is fully out with baths filled first.

What affects the cost of new build mastic

We quote each job individually. This is what makes a difference:

  • How much old sealant there is and how hard it is to remove
  • Any mould that needs treating
  • How many rooms, windows or areas are involved
  • Access and height

What you pay reflects the work, not guesswork. That is why we ask a few questions first and send you a clear quote before we start.

Helping us quote

To make quoting easier, let us know:

  • Where the job is, and your postcode
  • Any access issues, like height or stairs
  • How many joints, rooms or windows are involved
  • The type of property

Asking for a quote is easy: let us know the job and the location. A few photos by email make the job easier to understand, and we will take it from there.

Joints and finishes in Melby homes

Melby is close to the coast. Plot mastic on new homes near the coast takes more weather than it would inland, so it’s worth checking at snagging. Island jobs need planning around ferries and the weather, so the more notice, the better.

Whether the job is in Melby itself or nearby, the right material for each joint matters as much as a neat finish. Around Melby, as everywhere, new build mastic is only as good as the preparation behind it.

Melby is in the Shetland Islands. Melby gets the same service as everywhere we cover: old sealant removed completely, careful preparation and a one-year guarantee. Our area takes in 63 places across the Shetland Islands, from the larger towns to small villages.

Our applicators cover all of the ZE2 postcode area for new build mastic and the streets around it. Other places close to Melby include Sandness (1 mile south-east), Walls (6 miles south-east), Aith (10 miles east), Easter Skeld (11 miles south-east) and Brae (12 miles north-east). Remote and island addresses need a little more planning, so tell us where you are when you ask for a quote.

What’s near Melby

Green spaces nearby include Loch of Norby.

Map of Melby © OpenStreetMap contributors
20+ yearsMastic and sealant specialists
ARBOMaster approvedApproved applicator for Arbo sealants
Fully insuredDomestic, commercial and hotels
One-year guaranteeOn every job