Highland · Scotland
Fire-rated sealant in Farr, Highland
Intumescent and fire-rated sealant around gaps, frames and service penetrations for homes and businesses in Farr and across Highland. Fully insured, ARBOMaster approved and guaranteed for a year.
- Ordinary sealant used where a fire-rated product was needed
- Fire seals that have cracked with movement
- Fire stopping disturbed by later work
How we handle fire rated sealant in Farr
A gap around a door frame, a linear joint at the head of a wall and a hole round a pipe are each sealed differently. We check the size and the substrate before choosing the product, then the sealant goes in to the depth the product’s details set. We work on plasterboard & masonry, door frames and flats & HMOs, and the jobs we see most are joints picked up in a fire-stopping survey and unsealed gaps where pipes and cables go through a wall.
In a smaller place like Farr, commercial jobs are more likely to be a hotel, guest house, school, surgery or community hall than an office block. All of them have washrooms, kitchens and fire-rated joints that need looking after.
A 12-month guarantee comes as standard, so you are not left on your own once the job is done.
- Where
- Farr (IV2)
- Region
- Highland
- Guarantee
- A year, on every job
- Quotes
- A clear quote up front
- info@mrmastic.co.uk
- Last updated
- 26 October 2026

What fire rated sealant looks like in Farr
Scotland has its own building regulations, the Building (Scotland) Regulations, with technical handbooks. Fire-rated sealant is installed to the manufacturer’s tested details, though we don’t certify buildings or do fire risk assessments.
Whether the job is in Farr itself or nearby, the right material for each joint matters as much as a neat finish.
Farr is about 6 miles south of Inverness, in Highland. Anywhere in IV2, we cover fire rated sealant for homes and businesses. We cover 253 towns and villages across Highland. Dundee is on our list too, around 78 miles away.
All of IV2 is covered for fire rated sealant, from the main roads to the quietest streets. With the B851 close by, Farr is simple for us to get to. Close by, we work in Milton of Leys (4 miles north), Slackbuie (4 miles north), Lochardil (5 miles north), Hilton (5 miles north) and Dores (6 miles west). Larger places within reach include Inverness (6 miles north), Cradlehall (7 miles north), Merkinch (7 miles north), Crown (6 miles north), Millburn (7 miles north) and Muir of Ord (14 miles north-west). Remote and island addresses need a little more planning, so please mention your location when you send an email to info@mrmastic.co.uk.
Local landmarks in Farr
Nearby you’ll also find Leys Castle (3.7 miles north) and Raigmore Hospital (6 miles north). Not far away are Loch Farr.
What we do, step by step
Good joint work is mostly preparation, so that is where we spend the time. Every joint is cleaned and dried before new material goes in. All told, the work takes anything from a few hours to several days, depending on how many gaps there are. Somewhere like Farr may be a longer drive, and the journey is planned ahead. Tell us about tracks, gates, a ferry crossing or anything unusual about getting there.
- We begin by agreeing the list of gaps from your assessor’s or designer’s requirements.
- Each gap is measured and its substrate and service noted.
- Any non-fire-rated filler is removed.
- The specified fire-rated sealant goes in over any backing its detail requires.
- Every location is recorded with the product used.
Before we arrive
- Clear the area around the work
- Tell us if parking is tricky
- For business premises, tell us about site rules or sign-in
Get a quote
Call for a quick quote, or send an email if you’d rather. Describe what needs sealing and we’ll talk you through the work before giving you a price.
Read more
Why deal with it now?
Waiting for the next refit can leave a gap open for years. On its own, sealing it now is a small job and needn’t wait for anything else. In an older home around Farr, damp from a failed joint can get into timber and plaster, which is a far bigger job than the sealant.
Rather than a set price list, we price the job in front of us: the amount of work, the old material and the access. The price is agreed before we begin.
Why us?
- Sanitary silicone with an anti-fungal additive in wet areas
- Old sealant always removed completely
- Approved under the ARBOMaster scheme
- Homes, businesses and hotels
Work for landlords, hotels and businesses
For anyone letting property in or around Farr, several properties can be quoted together. Send us the addresses and the work at each, and pictures by email help.
In hotels, rooms out of use cost money, so the work can be planned room by room around your bookings where we can. Hotel work is part of what we do, alongside homes and businesses.
More services for Farr
DIY versus a professional finish
Sealing over old silicone is the commonest DIY error. New silicone will not bond to old, so it lifts and traps water and mould underneath. All the old material has to come out first.
If you’re set on DIY, put the effort into preparation: take out all the old sealant, make sure the joint is clean and dry, and give it the full cure time. If it does not work out, we can still put it right.
How to look after the new joints
Good habits help new joints last longer. Our tips:
- Plan fire stopping into any work that goes through walls or floors
- Take photos of fire stopping before ceilings or boxing go back
- Make resealing part of every contractor’s brief
- Report cracked or damaged seals as soon as you notice them
Follow the cure time we give you before decorating over the sealant. Some fire-rated sealants can be painted and some can’t, so ask us which we used.
Open gaps do not only matter in a fire: noise, draughts and even pests can come through too. Dealing with them early helps with all of these.
Farr: your questions answered
Do Scottish building rules affect fire-rated sealant work in Farr?
Scotland has its own building regulations, the Building (Scotland) Regulations, with their own technical handbooks. Fire-rated sealant has to go in to the product’s tested details, and we follow them. We don’t certify buildings or carry out fire risk assessments, so your fire risk assessor or building control will advise on what’s needed.
Can you do fire rated sealant in Farr?
Yes, Farr is within the area we cover. Our work covers the whole of Scotland. You can send an email to info@mrmastic.co.uk and tell us what needs doing.
What’s the difference between intumescent and fire-rated sealant?
An intumescent material expands when it’s heated. Intumescent sealants are a type of fire-rated sealant, and the choice depends on the gap.
Can you work in occupied buildings?
Yes. Occupied flats, HMOs, offices and schools are all fine, with access planned around residents or staff. Out-of-hours work can be arranged.
Will there be a smell?
That depends on the sealant. Some smell for a while, some hardly at all.
Can you give us a record of the work?
Yes. Locations and products are written up when we finish. Tell us if your assessor needs it in a particular format.
Will the old sealant be removed?
Yes, every time. New sealant won’t bond properly to old, so any old material comes out before anything new goes in.
Is standard sealant good enough for a fire gap?
No. Where a fire-rated seal is needed, it has to be a product tested for that use, installed to its details.
What sealant work cannot fix
New sealant cannot fix everything, and we will tell you before work begins. It won’t solve:
- Deciding what fire stopping a building needs
- Walls or floors that weren’t built to resist fire
- Large holes that need a different fire-stopping system
If you’re not sure, just email us at info@mrmastic.co.uk and we will give you a straight answer before you book.
Where we work in Farr
- Service penetrations
- Flats & HMOs
- Door frames
- Pipe & cable gaps
- Linear gaps
- Plasterboard & masonry
When to call us in Farr
Many open fire-stopping gaps are made after the building is finished. Electricians, plumbers and data installers drill through walls and ceilings and the hole round the new service isn’t always sealed again.
Look out for these signs:
- New service routes left unsealed after building work
- Old fire sealant that has split or come away
- Open joints along the top of partitions
- Sealant items on a fire risk assessment action list
In and around Farr, as anywhere, good fire rated sealant starts with a clean, dry, properly prepared joint.
What your quote should include
- Are they insured?
- How hidden problems are handled
- What the quote includes, VAT included or not
- Who does the work, and how experienced they are
