Brighton and Hove · England

New Build Mastic in Rottingdean

New build mastic across Rottingdean and nearby, with every bit of old sealant taken out first and a one-year guarantee.

  • Internal frame sealant that has split
  • New-build shower sealant that has already split
  • Kitchen sealant that has pulled off the wall

Trusted new build mastic in Rottingdean

Signs you need new build mastic in Rottingdean

Fresh sealant can be knocked or cut by trades finishing off. A bead disturbed before it has cured may never seal properly, and the problem shows up after you move in.

These are the problems we are asked about most:

  • Smeared, uneven beads picked up at snagging
  • Joints pulling apart as timber shrinks
  • Cracked sealant around new window and door frames
  • Shower seals failing in the first year or two

Around Rottingdean, as everywhere, new build mastic is only as good as the preparation behind it.

What to look for in a quote

  • Which colour the sealant will be
  • How long to leave it before use
  • What product goes in the joint
  • What insurance they hold

How to choose a mastic man

New build mastic in Rottingdean

If your new home has a leaking shower seal, open skirting joints or untidy sealant, we can help. If you’re still within the builder’s snagging or warranty period, tell them first. We work on plot handovers, bathrooms & en suites and windows & doors, and common reasons people get in touch are joints pulling apart as timber shrinks and plot mastic for developers ahead of handover.

Around Rottingdean, older homes often have timber floors that move through the year, which is why skirting and threshold joints need a flexible sealant, not filler.

The work is guaranteed for twelve months. If there’s a problem with our work within the year, let us know and we will sort it.

Where
Rottingdean (BN2)
Region
Brighton and Hove
Cover
12 months on all our work
Quote
A clear quote up front
Call
0345 464 0079
Updated
26 October 2026
Applicator in a navy top running a bead of silicone up a shower screen wall profile

The process

When we get to you, we compare the joints with what we discussed. If anything is different, we explain it before carrying on. Most jobs then take anything from a few hours to several days, depending on the number of plots. Somewhere as small as Rottingdean, access is often the only tricky part. If the job is outside, mention outbuildings, exposed walls and how to reach them.

  1. First, the list of joints is agreed from your snagging sheet or plot schedule.
  2. Every bit of the old builder’s sealant is cut out down to clean surfaces.
  3. We clean out the dust and grit left from the build.
  4. Primer goes on where the surface and product need it, then the new sealant.
  5. We tool every joint neatly and tell you when each area can be used.

Getting ready for the visit

  • Keep children and pets away from the work area
  • Mention any leaks or damp you’ve noticed
  • On commercial sites, let us know about site rules

Getting a quote

We quote each job on its own. Simply call 0345 464 0079 or email us and describe the job, and pictures are welcome.

Ask for a quote

Read more

Leave it or put it right?

A quick bead over the top of the old sealant can look fine at first, but it won’t bond to the old layer. A lasting seal starts with removing the old one completely. Where a wall is exposed, as many are in small places like Rottingdean, wind-driven rain gets into any failed joint, and damp in older walls is slow to dry out.

The cost reflects the work involved, not a rough estimate. That is why we ask a few questions first and give you a clear quote before any work starts.

Why Rottingdean clients choose us

  • Every job guaranteed for a year
  • Arbo and Everbuild products
  • Anti-fungal sanitary silicone in wet areas
  • An ARBOMaster approved applicator

Read how sealant jobs are priced or our reviews.

How to look after the new joints

Looking after new joints is easy, and it makes a real difference:

  • Use the extractor fan every time you shower
  • Wipe joints with warm soapy water
  • Put sealant faults on your snagging list early
  • Get a leaking seal dealt with straight away

Wipe the sealant with warm soapy water. Avoid abrasive pads and strong solvents.

Mould takes hold quickly in sealant that has gaps or lifted edges. Dealing with it before it goes black saves a harder job later.

Common questions in Rottingdean

Is Rottingdean in your area for new build mastic?

Yes. Our work covers London and the South East, and Rottingdean is part of that. You can call 0345 464 0079 or email us and let us know what needs doing, and we will give you a clear quote.

I let a flat near Moulsecoomb station. Can you help?

Yes, landlords and agents are among the people we work for. Just call 0345 464 0079 or drop us an email with the address and what needs doing, and we will give you a clear quote.

Is it worth trying it myself?

Some simple jobs can be done by a careful DIYer. The usual mistakes are sealing over old sealant, sealing a damp joint and using too much.

What information do you need?

The location, the problem and the rough size of the job. If you can, email a few photos.

Will it make a mess?

Not at all. We work neatly, protect the area around the joints and tidy up afterwards.

Will you just run a new bead over the existing one?

No. New silicone will not bond to old silicone, so sealing over the top fails quickly. The old sealant always comes out first.

Do you work for hotels and businesses?

Yes. We can plan bigger jobs in stages.

What do you put in the joint?

Each joint gets the product that suits it. Where it moves, gets wet or faces the weather makes a difference.

New homes and floors in Rottingdean

Rottingdean is within about 1 mile of the coast. New homes near the sea put their outside mastic to work from day one, so it’s worth checking at snagging. Compared with the north and west, the South East gets less rain, though outdoor sealant still has to go onto a dry joint, so the forecast decides the day.

If you’ve bought a new home near Moulsecoomb station, the sealant around baths, showers and frames is worth checking in the first year or two.

Rottingdean is about 3 miles west of Telscombe, in Brighton and Hove. Across the BN2 area, we can carry out new build mastic at your property. Rottingdean is one of 30 places in Brighton and Hove we cover.

Work in BN2 is quoted and booked the same way as anywhere else. If you need new build mastic at a property on Longhill Road, New Barn Road and Court Ord Road or anywhere close by, we can help. We also cover Ovingdean (1 mile west), Roedean (1 mile west), Saltdean (1 mile south-east), East Saltdean (2 miles south-east) and Telscombe (3 miles east). Larger places within reach include Brighton (3 miles north-west), Brighton and Hove (6 miles west), Hove (5 miles west), Carlton Hill (3 miles west), Hanover (3 miles west) and West Hill (4 miles west).

What’s near Rottingdean

Locally, jobs take us to homes and businesses close to Ovingdean Hall School, Our Lady of Lourdes RC School and Beacon Hill, among other places. For rail, the closest station is Moulsecoomb station, roughly 3.2 miles north-west. A little further out are Churchill Square (3.6 miles west) and French Convalescent Home (1.9 miles west). Open spaces near Rottingdean include Beacon Hill Local Nature Reserve and Newmarket Hill.

Map of Rottingdean © OpenStreetMap contributors

For landlords and businesses

From a single let to a portfolio, you get the same standard of work: old sealant fully removed, joints prepared properly and a one-year guarantee.

Housing providers, facilities teams and property managers book us too in Rottingdean and across Brighton and Hove. Several sites can go on one quote, and we’re fully insured.

DIY versus a professional finish

What a professional job adds is preparation and the right product. Joints are cleaned back to sound surfaces and dried, and the sealant is chosen for how the joint moves and where it is.

The biggest DIY mistake is sealing over old sealant. New silicone won’t bond to old, so it lifts and traps water and mould underneath. All the old material has to come out first.

When something else is needed

Before you book, it’s worth knowing the limits:

  • Leaks from pipes, valves or wastes, which need a plumber
  • Structural cracks in walls or ceilings
  • Deciding who is responsible under a builder’s warranty

If in doubt, phone 0345 464 0079 or drop us an email and we will say what we think.

Surfaces we seal

  • Bathrooms & en suites
  • Kitchens
  • Windows & doors
  • Skirting & floors
  • Show homes
  • Plot handovers
20+ yearsMastic and sealant specialists
ARBOMaster approvedApproved applicator for Arbo sealants
Fully insuredDomestic, commercial and hotels
One-year guaranteeOn every job