Moray · Scotland
New-build mastic & snagging in Forres, Moray
Plot mastic for developers and snagging failed sealant in new homes for homeowners, landlords and businesses in Forres. Fully insured, ARBOMaster approved and guaranteed for a year.
- Shower seals failing in the first year or two
- Smeared, uneven beads picked up at snagging
- Kitchen sealant that has pulled off the wall
New build mastic in Forres
For builders and developers, we work through plots to the schedule you give us. Bathrooms, en suites, kitchens, frames and skirting are sealed ready for handover using the right product for each joint. Typical jobs include untidy sealant flagged on a snagging list and kitchen sealant that has pulled off the wall, across bathrooms & en suites, kitchens and show homes.
Scottish towns like Forres have older streets and newer estates, with new homes still being built in many. Newer homes need snagging; older ones need their joints renewing.
Each job carries a 12-month guarantee.
- Where
- Forres (IV36)
- Region
- Moray
- Guarantee
- One year on every job
- Price
- A clear price before we start
- info@mrmastic.co.uk
- Updated
- 26 October 2026

What sealant work can’t fix
It helps to know what we can’t do too:
- Disputes or warranty claims with your builder
- Structural cracks in walls or ceilings
- Movement caused by a poorly fitted tray or bath
Not sure which it is? You can email us at info@mrmastic.co.uk and we’ll tell you honestly.
Where we work in Forres
- Skirting & floors
- Show homes
- Plot handovers
- Bathrooms & en suites
- Windows & doors
- Kitchens
More services for Forres
The process
When we arrive, we look over the joints with you first. We protect the surfaces around the joints before we start. Most jobs take a few hours for most snagging lists, longer for a run of plots. A visit in Forres needs three things planned: access, parking and where the work is. Outdoor jobs need a dry day, so they can move if the weather turns.
- We start by agreeing which joints are on the list, from the snagging sheet or plot schedule.
- Failed or untidy sealant is cut out completely.
- Each joint is cleaned of dust and grit, then primed if required.
- We apply a sealant that suits each joint and tool it to a neat finish.
- Finally, each room is checked and you’re given the cure time.
Preparing for the visit
- Mention any parking rules near the property
- Clear the area around the work
- Tell us about any previous sealing or DIY attempts
Getting a quote
There’s no standard price list, because every job is different. Instead, your job gets its own clear quote. To arrange one, send an email to info@mrmastic.co.uk.
Read more
How we quote for new build mastic
Every job gets its own quote. These are the things that affect it:
- The number of rooms or windows
- How easy the joints are to reach
- How much old sealant there is and how hard it is to remove
- Whether there’s mould to deal with
Homes and businesses are quoted the same way: the amount of work, the access and the products needed. Ask us for a quote and we’ll go through it with you.
What to tell us for a quote
Photos by email are helpful but not essential. Please mention:
- Where the property is
- What the problem is, such as mould, gaps, leaks or cracking
- A few photos by email, if you can
- Roughly how big the job is
Getting a quote is simple: let us know what needs doing and where. Photos by email help us understand the job, and we will come back to you with a quote.
What happens if it’s left?
A hairline gap at a skirting can wait, but a leaking seal cannot. If you are unsure which you have, drop us a line at info@mrmastic.co.uk with pictures. Scottish weather finds any gap, and in a town like Forres, failed outside joints soon let damp into walls. Indoors, failed sealant lets water into floors and ceilings.
Leaving a failed joint generally makes the job bigger, not smaller, because water and mould keep working on it. If you’re unsure, drop us a line at info@mrmastic.co.uk and we will give you an honest view and a quote.
Why choose Mr Mastic in Forres
- Arbo and Everbuild products
- Neat joints and a tidy finish
- Colour agreed with you before any work starts
- Every job guaranteed for a year
Take a look at what affects the cost and our reviews.
Keeping the joints in good condition
Aftercare is simple, and it makes a real difference:
- Ventilate bathrooms well, especially in the first year
- Act quickly if a seal starts to leak
- Photograph failed sealant before it’s redone
- Resist patching a failed seal with a tube from the DIY shop
Avoid standing on the rim of the bath or the edge of the tray while the sealant cures. If a bath or tray moves when you stand in it, get it looked at.
Mould takes hold quickly in sealant that has gaps or lifted edges. Resealing before mould gets in saves a harder job later.
New homes and floors in Forres
Forres is within about 3 miles of the coast. Plot mastic on new homes near the coast takes more weather than it would inland, so it’s worth checking at snagging. Many new homes in Scotland are timber-framed, so skirting and sealant joints can open up as the building settles.
In and around Forres, as anywhere, good new build mastic starts with a clean, dry, properly prepared joint.
Forres is about 12 miles west of Elgin, in Moray. Jobs in Forres get the same care as everywhere else we work: old sealant removed completely, careful preparation and a 12-month guarantee. Our Moray coverage runs to 58 places, and Forres is one of them. You can also see our page for Aberdeen, roughly 64 miles from Forres.
Work in IV36 is quoted and booked the same way as anywhere else. Local streets include Church Road, Market Street and High Street, all of which we cover. With the A96 and A940 close by, Forres is easy for our applicators to reach. Neighbouring places we cover for new build mastic include Red Craig (1 mile south-west), Mundole (2 miles south-west), Rafford (2 miles south-east), Dyke (3 miles west) and Moor of Granary (3 miles south-east). We also work in nearby towns such as Elgin (12 miles east), Lossiemouth (14 miles north-east), Ashgrove (12 miles east), Burghead (8 miles north-east), Hopeman (10 miles north-east) and Lhanbryde (15 miles east). Forres is one of the larger places we cover in Moray. For island and remote addresses, the job takes a little more planning, so mention it when you ask for a quote.
What’s near Forres
Typical jobs here are in homes near Forres Academy, Red Lion Hotel and Roysvale Park and the streets around them. For rail, the closest station is Forres station, about 0.5 miles north-west. Nearby you’ll also find Forres Castle (within half a mile north) and Leanchoil Hospital (1 mile east). Green spaces nearby include Sanquhar Loch and Cluny Hill.
Do you need new build mastic in Forres?
Sealant is often one of the last jobs before handover. Joints aren’t always cleaned of dust or primed, so the bead never bonds properly.
It’s worth asking for a quote if you see:
- Smeared, uneven beads picked up at snagging
- Plot mastic for developers ahead of handover
- Sealant applied over dusty or wet surfaces
- Joints pulling apart as timber shrinks
If you’ve bought a new home near Forres station, the sealant around baths, showers and frames is worth checking in the first year or two.
What your quote should include
- Whether VAT is included
- Is the old sealant removed completely?
- Who does the work, and how experienced they are
- The length of the guarantee
Forres questions
Do you cover Forres for new build mastic?
Yes, Forres is within the area we cover. Our work covers the whole of Scotland. Just send an email to info@mrmastic.co.uk with a few details of the job.
Is there a guarantee on new build mastic in Forres?
Every job comes with our one-year guarantee, wherever it is. We’re also fully insured and ARBOMaster approved.
Can you work on commercial sites?
Yes, regularly. We can plan bigger jobs in stages.
Can you reseal over the builder’s sealant?
No. Fresh silicone does not stick to the old layer, so sealing over the top fails quickly. We cut the old bead out completely.
Do you hold any approvals?
Yes. Mr Mastic is an ARBOMaster approved applicator.
Do you have insurance?
Yes, we’re fully insured.
Who should fix failed sealant in a new build?
If you’re still within the builder’s snagging or warranty period, report it to them first. If it is not sorted, or keeps failing, get in touch with us.
Do you take on second-fix sealing for builders?
Yes. Second-fix sealing in bathrooms, kitchens, frames and floors is part of what we do. Good preparation keeps snagging to a minimum.
What the job involves on each surface
Plot handovers
Developers can send the plot schedule and specification. Sealant work across the plot is covered as agreed.
Windows and doors
External mastic around new windows and doors is sometimes rushed or missed. It’s resealed with an exterior sealant suited to the frame and wall.
