Greater London · England

Kevington Fire Rated Sealant

Problem with your fire-stopping gaps in Kevington? We remove the old material, prepare the joints and seal them properly, with a 12-month guarantee.

  • Sealant items on a fire risk assessment action list
  • Open gaps behind door architraves
  • Open joints along the top of partitions

Need fire rated sealant in Kevington?

How we handle fire rated sealant in Kevington

We do not assess buildings or decide what fire stopping is needed; your assessor, designer or building control sets that out. What we do is apply the right product to that specification, properly and neatly. Typical jobs include cracked or shrunken fire-rated sealant and open holes round services passing through fire walls, on service penetrations, pipe & cable gaps and flats & HMOs.

In London’s blocks of flats, service risers and common parts have pipes and cables passing through walls and floors. In Kevington, building managers may need both fire-rated sealant around those openings and new sealant in shared washrooms.

There’s a 12-month guarantee on every job, whatever its size.

Place
Kevington (BR5)
Region
Greater London
Cover
One year on every job
Quotes
A clear price before we start
Phone
0345 464 0079
Last updated
26 October 2026
The Mr Mastic team in navy uniforms in front of three Mr Mastic vans

Landlord and commercial work in Kevington

From a single let to a portfolio, you get the same standard of work: old sealant fully removed, joints prepared properly and a 12-month guarantee.

Letting agents often deal with us directly. Send the address, what’s needed and the access arrangements and we’ll quote.

What we do, step by step

At the end, we look at the finished work together. The visit itself generally takes a few hours for a handful of gaps, and longer for a whole building, depending on the size of the job. Many London jobs are in flats, so we come ready for stairs, narrow hallways and shared entrances. Mention any building rules, key holders or managing agents when you book.

  1. Access to each area is agreed so the work can run in order.
  2. We take out any damaged or unsuitable sealant.
  3. Dust and loose debris are cleaned from each gap.
  4. The fire-rated or intumescent sealant is applied and tooled to the tested detail.
  5. We record what was done and flag anything that needs a different system.

Preparing for the visit

  • Try not to wet indoor joints just before the visit
  • Tell us about any water getting in
  • Clear items away from the joints we are working on

Get a quote

For a quick quote, get us on the phone, or send an email if you’d rather. Tell us about the joints that need doing and we will explain what’s involved before giving you a price.

Get a price

Read more

How to look after the new joints

No joint lasts for ever, but care makes a real difference. Our tips:

  • Include hidden areas like risers in routine checks
  • Flag any open gap you spot round a pipe or cable
  • Take photos of fire stopping before ceilings or boxing go back
  • Do not paint over fire sealant until it has cured

Tell other trades that the gaps have been sealed, and ask them to reseal anything they cut through. A lot of damaged fire stopping comes from later work.

Any job that breaks through a wall or ceiling should include resealing. Doing it at the time avoids leaving gaps behind.

Can I do it myself?

Overfilling a joint is a classic DIY mistake. A thick, smeared bead looks untidy and does not move well, and the joint depth matters as much as the finish.

If you do try it yourself, take your time over the preparation: take out all the old sealant, make sure the joint is clean and dry, and give it the full cure time. If it fails, we can still redo it.

What happens if it’s left?

Leaving a gap until a refurbishment comes round can mean years with it open. On its own, sealing it now is a small job that doesn’t depend on other work. In a London flat, a failed joint rarely stays your problem alone: water can reach the neighbours below, and gaps in fire-rated joints affect the whole building.

There are no prices on our website, because each job is priced on what it involves. Call for a quick quote and we’ll talk you through it.

Why book with us

  • More than 20 years in sealant work
  • Old sealant always removed completely
  • Quality sealants from Arbo and Everbuild
  • Experience in homes, commercial sites and hotels

See our cost guide or our reviews.

How we quote for fire rated sealant

Jobs vary more than people expect. The main factors:

  • Mould in or behind the old joints
  • How much old sealant there is and how hard it is to remove
  • How many rooms, windows or areas are involved
  • The type of sealant required

Combining jobs into one visit is generally more efficient than separate visits. You’ll get one clear quote for the whole job.

Asking for a quote

Photos help, but a description is a good start. Try to tell us:

  • Access, such as stairs, a lift or height
  • What the problem is, such as mould, gaps, leaks or cracking
  • How many joints, rooms or windows are involved
  • If it’s domestic, commercial or a hotel

To get a quote, phone 0345 464 0079 or send us an email with the location and a short description of the problem. You will have a clear quote before any work starts.

Your questions about fire rated sealant in Kevington

Is parking an issue for fire rated sealant in Kevington?

It can be, so it helps to tell us about permits, visitor bays or off-street space when you book. The visit is then planned around what’s available.

Can you help a landlord with a rental near St Mary Cray station?

Yes. We work for landlords and agents as well as homeowners. You can call 0345 464 0079 or send us an email with the details for a clear quote.

Are you an approved applicator?

Yes. We hold ARBOMaster approved applicator status, and we’re fully insured.

Can you tell me which gaps need fire stopping?

No. Your fire risk assessor, designer or building control decides that. We apply fire-rated sealant to the requirements they set.

Can I do it myself?

It depends on the job. Work at height, movement joints, fire-rated gaps and large areas are best left to a professional, while a short indoor joint may be within reach.

How much does fire rated sealant cost in Kevington?

There’s no set price, as it depends on the job: how much there is, what’s there now, how we reach it and what it needs. You will get a clear quote before we start.

What information do you need?

Tell us what needs doing and where, plus pictures if you have them. If we need more, we’ll ask.

Can you seal over the old sealant?

No, it will not last. It can look neat for a few weeks, but the new layer lifts away from the old one. Removing the old sealant completely is the only lasting way.

Common problems we fix in Kevington

Gaps around door frames are easily missed. The gap between the frame and the wall is hidden behind the architrave, so it can be left open when a door is replaced.

Most people get in touch after spotting one of these:

  • Gaps left after a refit or conversion
  • Open holes round services passing through fire walls
  • Seals cut through by electricians, plumbers or data installers
  • Sealant items on a fire risk assessment action list

Community buildings like Unity Church are part of the picture too: older buildings that have had new heating or wiring often have service gaps worth checking.

What to look for in a quote

  • What preparation is included
  • When the joint can take water or movement
  • Whether you can choose the colour
  • Whether they’re fully insured

Our hiring checklist

What fire rated sealant looks like in Kevington

In England, the Regulatory Reform (Fire Safety) Order 2005 requires a fire risk assessment for workplaces and for the common parts of blocks of flats, and gaps around services are often picked up there. We apply fire-rated sealant to the assessor’s or designer’s specification and the product’s tested details. Many London buildings have tight access and loading restrictions, so out-of-hours working can be arranged where needed.

Letting a property close to St Mary Cray station? Then new cables or pipes through a fire-resisting wall leave a gap that needs the right sealant. Kevington is in London, so parking needs planning: tell us about permits, visitor bays or off-street space when you book.

Kevington is about 1 mile east of Orpington, in Greater London. For fire rated sealant in and around Kevington, please ring 0345 464 0079 or send us an email for a quick quote. We cover Greater London from our Crawley base, Kevington included. Kevington is one of 764 places in Greater London where we work. Our London page covers work nearby, about 13 miles away.

We work across the BR5 postcode area for fire rated sealant and the streets around it. We cover properties on Crockenhill Road and Sheepcote Lane. Nearby, we also carry out fire rated sealant in Derry Downs (1 mile west), Crockenhill (1 mile east), St Mary Cray (1 mile west), Orpington (1 mile west) and Poverest (2 miles west). Within a short drive, we also cover London (13 miles north-west), City of Westminster (15 miles north-west), Marylebone (15 miles north-west), St Pancras (15 miles north-west), Shoreditch (13 miles north-west) and Walthamstow (15 miles north-west).

Near you in Kevington

Typical jobs here are in homes near The Priory School and Harris Academy Orpington. The closest station to Kevington is St Mary Cray station, roughly 1.4 miles north-west of the centre. Other landmarks nearby include Lullingstone Castle (3.2 miles south-east) and London Borough of Bromley Museum (1.5 miles west). For a walk, there’s Summer Hill and The Warren.

Map of Kevington © OpenStreetMap contributors
20+ yearsMastic and sealant specialists
ARBOMaster approvedApproved applicator for Arbo sealants
Fully insuredDomestic, commercial and hotels
One-year guaranteeOn every job